Week 7 - Roof, Windows, Insulation and Spa!


Front of the House. Tiles on, Windows in. Taken 15/05/2010

Rear Left of the house - the utilities side Taken 15/05/2010



Taken from the front left of the house. Overlooking the lounge, kitchen/meals and alfresco area

Plumbing for the island bench Taken 15/05/2010


HSTP has been filled in now

Our soil pile is dissapearing and the utilities side of the house has been evened out and looks pretty good now. Taken 15/05/2010

THE SPA'S IN! YAYAYAYAYAYAYAY

Plumbing for the spa Taken 15/05/2010

The roof. Every tile has been tied down. Taken 15/05/2010


Our front door ready to go in. Taken 15/05/2010

I couldn't help it. Had to get in the spa! Taken 15/05/2010