Sunday, August 15, 2010

Nearly Finished!

So we went to check on the house on Saturday and the house is nearly fished.

There's a few bits and pieces that need to be completed. The tiler has to come back and finish the grouting. The brickie needed to put a few bricks back in place that the plumber had to remove for the pump for the spa and fix a gap that we found. I guess the painter needs to come back and touch up a few bits and pieces and then site clean and we're in! YAY!


We have some weird switch that controls the pump and turns it off and on or something. I think that might be Glens department!

The kitchen completed. We managed to get an extra power point in the dining area because one of the cables wasn't long enough so he put another double in next to it! Oh and can you see our stupid lights... they look like the bottom half of a ballerina poking out the roof! Don't worry. We'll be changing those over!

The carpeted master bedroom. Glen in the mirror in the en suite! You can also see the shelving in the robe. I asked for it lowered so i could actually reach stuff on the shelf so.


The lounge area.

No comments:

Post a Comment